| | 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! | |
|
|
| Author | Message |
|---|
conveying2003
Posts: 11 Join date: 2011-03-01
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sat Oct 08, 2011 3:33 pm | |
| Hi organizer
Mind if I can have your mobile #? My first ride with this group. Don't know anyone yet. Will the ride still be on if it starts to rain in the evening?
Jessy |
|
 | |
George Lim

Posts: 135 Join date: 2011-04-10
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sat Oct 08, 2011 6:38 pm | |
| Hi Jessy, Joint the love cycling FB. will post the detail on FB. Happy Riding. |
|
 | |
George Lim

Posts: 135 Join date: 2011-04-10
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sat Oct 08, 2011 9:37 pm | |
| Hi all Ironbutter ,
Next Sat is the ride, are you ready? Never mind at lease make sure your bike are ready. Now are some tip to ensure your bike run smooth.
Bicycle 1.Clean and lubricate bicycle as necessary, especially chain and derailleur so that it shifts properly. 2.Check wheel bearings, bottom bracket, pedal adjustment and headset for looseness. 3.Check brakes and derailleur for adjustment. 4.Are there stiff links in the chain? If so, loosen them up. The chain should be replaced every year as a minimum. 4.Check condition of wheels. Are they out of true? Adjust or have a shop do this if necessary. 5.Check condition of the tires. Do they need to be replaced or repaired?Also check your Tire pressure. 6.Check condition of the pump and spare. Is there a repair kit? 7.Clean out your water bottles. There may be things growing in them.This is a long distance ride, you may need extra water bottles.
Tool you need Tire repair kit & if you have muti-tool please bring it.
Food Anything you comfortable with. Some Sport drink. As this ride is more that 2 hr, make sure you eat during the ride. There is rest stops during the ride, some might not have shop opening during the odd hours.Please top up your water supply when you have need.
Last, all the experience rider please add on to the list.
Tks Happy riding. George |
|
 | |
conveying2003
Posts: 11 Join date: 2011-03-01
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sun Oct 09, 2011 4:59 pm | |
| Hi George
I am not sure what is FB? Sorry. Anyway my mobile is 92957095 just in case. See you all on Sat at McD East Coast @ 7:30pm
Jessy |
|
 | |
George Lim

Posts: 135 Join date: 2011-04-10
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sun Oct 09, 2011 9:04 pm | |
| Face Book. Just joint Love Cycling SG Group.
|
|
 | |
MrMeow

Posts: 23 Join date: 2011-01-11 Location: Bedok Reservoir
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Mon Oct 10, 2011 5:14 pm | |
| Hi can I know if we are ending at ECP Mac for those who are going for the sunday TTSH hospices ride?? Thanks  |
|
 | |
MrMeow

Posts: 23 Join date: 2011-01-11 Location: Bedok Reservoir
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Mon Oct 10, 2011 5:17 pm | |
| HI can I know if we are ending ar ECP Mac for those who will continue with the TTSH hospices ride? |
|
 | |
George Lim

Posts: 135 Join date: 2011-04-10
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Mon Oct 10, 2011 10:26 pm | |
| The ride will end at ECP Mac. |
|
 | |
jasonleesb
Posts: 8 Join date: 2011-07-22
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Wed Oct 12, 2011 12:38 pm | |
| Just wondering,
Since there are 4 group, i am wonder if want to divide ?
2 groups do anti-clockwise, 2 groups do clockwise.
Reason : If there is a 15 mins interval between moving off, Group4 will have to wait for 60 mins. Also @ break point, lesser people to queue for the shops there are still open. |
|
 | |
Denlim
Posts: 4 Join date: 2011-06-20 Location: Tampines
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Thu Oct 13, 2011 11:34 am | |
| Regret to inform that I have to pull out of the ride this Sat as am still down with flu. Enojy your ride and ride safe.....
Denlim (Panda Team rider 11) |
|
 | |
Vince

Posts: 581 Join date: 2010-12-20 Location: Commonwealth
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Thu Oct 13, 2011 1:05 pm | |
| Hi Jasonleesb, Dun worry. On the day things will be different on the ground. Wun have zhun zhun 15 mins, we adjust according to situation. Some break points can be planned by the group by themselves, so sometimes wun see everyone clustering at the same place. Most important is everyone start together, ride together and end together  Denlim, take care and rest well! |
|
 | |
Mary_Ang

Posts: 400 Join date: 2010-12-22 Location: Jurong West
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sun Oct 16, 2011 4:24 pm | |
| It was another AWESOME ride ... we had created another classical history again. Especially Thank you to George , TaiWoon , Vince ( sponsor the freebie ) , Andy Yap ( to be our Registration ĺ°ĺ§ - prepare the indemnity and the Emergency contact list ), HOOT ride 128km sticker (who is the sponsor / designer / print ? ), Who sponsor the light stick and cable tie? , leaders , sweepers , Master Sweeper Steven Lim , Steve and Bernice ( LOVE drink ) , safety officer ... " Your Safety is our priority and all who participants the HOOT Ride 128km. Let's continue to create and make history .. more great and safety ride  Aunty Mary  ha ha ... |
|
 | |
ztcc78 Bad Man

Posts: 864 Join date: 2010-12-20 Location: Bukit Batok
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sun Oct 16, 2011 5:38 pm | |
| i hope the 4 riders in our team dun hate me for keep pressuring them to drop to next group.. just dun wan them pushing too hard and get injury.. _________________ ZT  (65) 9762 9276 FacebookLet's make SG a better place to ride for all |
|
 | |
Mary_Ang

Posts: 400 Join date: 2010-12-22 Location: Jurong West
 | |
 | |
LOTUSfairy
Posts: 51 Join date: 2011-10-02 Location: A HAPPY DOT IN SINGAPORE
 | Subject: Re: 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! Sun Oct 16, 2011 8:47 pm | |
| thank you to everybody who took great care of old auntie me... and kept motivating me during my journey (mac to yishun)  Heartfelt grateful and look forward to join u guys again.. you guys/gals are amazing!! |
|
 | |
| | 15th Oct 2011 Slow and steady Ride de Singapore Part 2 ( Night Version ) - CLOSED! WE HIT 61 ALREADY! | |
|